Manufacturing
RPO Transformation at BuildRight Construction
Client: BuildRight Construction
85
Placed
18 days
Avg Time to Hire
94%
12-month Retention
Manufacturing
Industry
All Case Studies
Published 4 March 2026 BuildRight Construction
1The Challenge
BuildRight's average time-to-hire was 45 days, causing project delays and increased reliance on expensive contractor labour. Their internal HR team was stretched thin across 8 construction sites.
2Our Solution
Deployed an embedded 2-person recruitment team
Redesigned the recruitment process from scratch
Built a pre-vetted talent pool of 500+ site-level professionals
Implemented weekly pipeline review meetings with hiring managers
3The Results
Time-to-hire reduced from 45 days to 18 days — a 60% improvement
85 roles filled in the first year
94% retention rate
Contractor labour costs reduced by 30%